Sustainability of Camarma de Esteruelas

Madrid, Madrid, Comunidad de

Camarma de Esteruelas avatar

How sustainable is Camarma de Esteruelas today?

2.8
Full starFull star
Empty starEmpty star

Camarma de Esteruelas is reducing electric-use emissions, though it doesn't benefit from grid renewables.

6ºin Madrid
6ºin Madrid, Comunidad de
225ºin España
7.782inhabitants (2023)
powerEcoatributos

Fragile balance between electricity consumption and CO2 emissions.

01
rhythmEcoatributos

Uncertain trend between electricity consumption and CO2 emissions.

01
balanceEcoatributos

Imbalance between CO2-free electricity consumption and consumption with emissions.

01

Recent achievements

What has Camarma de Esteruelas
achieved in the last 12 months?

The city has generated measurable results in energy and emissions. These are the verified data for the period.

522,3
MWh increased
+1,1%
Energy increase

What does it equal?

174
households/year
63
illuminated nights
653
inhabitants/year
158,2
tCO2eq increased
+38%
CO2 increase

What does it equal?

7908
trees/year
633
avoided flights
1.265.344
km avoided

Monthly year-over-year variation in electricity consumption

Monthly year-over-year variation in CO2 emissions from electricity consumption

verification icon

Claim your profile

Are you responsible for Camarma de Esteruelas? Verify your profile and access the control panel.

Contact

METHODOLOGY

What is the EcoRating?

The Biyiud EcoRating for cities is the decarbonization score obtained in the last 12 months from grid electricity savings, with results normalized against all cities in the same population category. The calculations are fed by real and verified data obtained from reading all electricity consumption points in the country.

When a citizen registers in the Biyiud App, they receive the active EcoRating points of their city.

Sources and boundaries of city GHG emissions

Scope 1

Pending

Emissions from sources located within the city boundaries

Scope 2

Emissions resulting from the use of grid-supplied energy, heat, steam and/or cooling within the boundaries

Grid-supplied energy

Scope 3

Pending

Emissions produced outside the city boundaries as a result of activities taking place within

Global Protocol for Community-Scale Greenhouse Gas Emission Inventories (GPC)